  • Anchor bolts down concrete and civil support for a 1M+ square foot manufacturing facility

     

  • Mass foundations for heavy equipment with 1/8” tolerance

     

  • Cast-in-place retaining walls up to 21’ tall

     

  • 50,000 CY of total concrete placed on site in less than a year

     

  • 95,000 manhours managed with 40+ craftspeople consistently on-site

THE CLIENT

Pratt & Whitney is a world leader in the design, manufacture, and service of aircraft engines.

THE PROJECT

Project Ranger was a greenfield project to construct a new facility for an American aerospace manufacturer. With global service operations, the company built the advanced manufacturing center on a 100-acre site in South Asheville. This local plant will make airfoils for civilian and military engines, including the F-35 Joint Strike Fighter and several Airbus and Embraer civilian jets.

Fessler & Bowman completed the cast-in-place retaining walls, deep foundations, structural concrete and slab-on-grade concrete on-schedule and within the budget.  A fast-paced, design-build environment required adaptability and team focused thinking throughout which contributed to the success of this project.